1 like 0 dislike
49 views

A building contractor has n days to complete a house project. If he uses one-third of the time to repair the roof and five days to paint the house, how many days will he have left to complete the project?

in Mathematics by | 49 views

1 Answer

0 like 0 dislike

n days to complete project

1/3 to repair

so it means  2/3  to paint and it takes 5 days 

2 = 5 days 

3 = more days 

3/ 2 x 5 

7.5 days to complete project

 

by Wooden (2,356 points)

Welcome to MathsGee Answers, a free online study network where students can ask, answer, and explore 24/7 for improved outcomes.



MathsGee Supporting City of Joburg

Enter your email address:

MathsGee Tools

Math Worksheet Generator

Math Algebra Solver

Trigonometry Simulations

Vectors Simulations

Matrix Arithmetic Simulations

Matrix Transformations Simulations

Quadratic Equations Simulations

Probability & Statistics Simulations

PHET Simulations

Visual Statistics

Interactive Courseware

ZeroEd Search Engine

Article Rewriter Tool

Word Counter Tool

Other Tools

STEM Gender Equality | ZOOM | Slack | eBook